In der Gemeinde Gumtow im Ortsteil Groß Welle im Landkreis Prignitz planen wir zwei bestehende Windenergieanlagen durch zwei neue zu ersetzen.
Repowering, i.e. two more powerful turbines for the Groß Welle wind farm
We are planning to replace two existing Vestas V90 wind turbines with an output of 2.0 MW in Groß Welle in the district of Prignitz with two more powerful Vestas V150 wind turbines, each with an output of 6.0 MW. The turbines are expected to produce an annual amount of electrical energy of around 13 million kWh per wind turbine at the site. The turbines applied for are located in a wind farm with 41 turbines. Four more have already been approved.
They will save around 20,000 tons of CO₂ per year and supply around 17,000 people with clean electricity.
Zwei Anlagen mit insgesamt 12 MW Nennleistung
20.000 in Tonnen pro Jahr
Die Anlage wird ca. 17.000 Menschen pro Jahr mit Strom versorgen
Vestas V150